Market status — July 27, 2026

PJMELEVATED
NYISOWATCH
ERCOTELEVATED
ISO-NEWATCH
MISONORMAL
CAISONORMAL

Emergency

Elevated

Watch

Normal

PJM — 5CP season active; post-peak conditions after July heat wave

  • 5CP Capacity Tags: Peak demand peaked July 2 at 168,158 MW (preliminary), breaking recent records during regional heat wave. Now post-peak, but 5CP allocation season remains active through end of summer with capacity obligations still binding on market participants.
  • Real-Time LMP: Pricing has normalized from heat wave spike levels; real-time data continues to be published via PJM Data Viewer. No significant congestion alerts or negative pricing reported in major hubs.
  • Demand Response: Demand response programs actively suppressed load during July 2 peak event; ongoing dispatch capability available for remaining summer peak periods as needed.

NYISO — ICAP season active; monitoring post-peak demand

  • ICAP Tag Tracking: Installed Capacity Market active; unforced capacity (UCAP) tags and peak-period allocations in effect. No recent de-listing events or qualification challenges reported in current cycle.
  • CBEP Program Alerts: Customer Benefit Emergency Participation program remained on standby during heat wave; no activations triggered as of July 27. Monitoring continues for remaining summer peak periods.
  • Day-Ahead Pricing: Day-ahead market pricing reflects post-peak normalization; zone-level spreads (NYC, Long Island, Capital) reflect typical summer transmission patterns without acute congestion.

ERCOT — 4CP season mid-window; Texas summer load elevated

  • 4CP Season Tracking: In active 4CP window (June–Sept). July 2 peak across Texas and surrounding regions during regional heat wave spurred DOE directive for maximum generation output. Load normalized post-July 2, but summer peaks remain routine through August-September.
  • ORDC Pricing: Operating Reserve Demand Curve adders have moderated from early-July elevated levels. No recent VOLL approach or reserve shortfall alerts; ERCOT grid dashboards show adequate operating reserves as of July 25.
  • Grid Condition Alerts: TXANS (Texas Advisory and Notification System) reports normal grid condition status; no active Weather Watch, Watch, Warning, Emergency, or Conservation Alerts currently in effect.

ISO-NE — FCM active; regional capacity market post-peak

  • FCM Tag Events: Forward Capacity Market in normal operations; July 2026 System & Market Operations Report shows $78 million in FCM value for June (13% decrease MoM and YoY). No recent de-listing bids or qualification show-cause notices reported.
  • Capacity Market Integration: Recent forward contracting reflects stable regional capacity adequacy; no import/export constraints or zonal deficiencies flagged in current assessment period.
  • Load Forecasting: Peak load forecasts projected 25,850 MW during early July heat wave; post-peak normalization observed. Seasonal peak load outlook remains typical for late July with standard summer demand patterns expected through August.

MISO — Planning Resource Auction complete; capacity pricing stable

  • Zonal Pricing: No acute zonal spreads reported; all 10 zones performing within normal LMP ranges. Recent 2026/27 Planning Resource Auction results (April 2026, effective June 1) cleared with annualized capacity prices of $116–$126/MW-day (down from prior year’s $212–$217).
  • Planning Resource Auction: 2026/27 PRA results finalized; capacity adequacy confirmed with no shortfalls in any zone. Summer capacity prices: North/Central $424.30/MW-day, Arkansas/Mississippi $384.10/MW-day, LA/Texas $412.10/MW-day (all significantly lower than prior summer).
  • Real-Time Settlements: Routine settlement activity; no unusual make-whole payments or settlement delays reported across MISO regions.

CAISO — Summer assessment complete; no Flex Alerts active

  • Flex Alerts: No Stage 1, 2, or 3 Flex Alerts issued or expected as of July 27. 2026 summer demand response enrollment and call-out capabilities remain in place for contingency.
  • Renewable Curtailment: Solar and wind curtailment levels remain within seasonal norms; overgeneration is not currently a problem per available outages data. Renewable integration running smoothly through summer period.
  • NQC Integration: 2026 Net Qualifying Capacity values for Resource Adequacy resources finalized; no recent RA deficiency notices or noncompliance filings. Flexible capacity needs assessment for 2026 completed and published.

Cross-Market Watch — Summer peak season behind us; focus shifts to grid resilience monitoring

  • Regional Heat Wave Impact: Early-July heat wave (peak July 2) affected PJM, NYISO, ISO-NE, and ERCOT simultaneously; PJM achieved record-breaking demand, DOE issued directive to maximize generation. All regional peak events have normalized post-July 2.
  • NERC Alerts and Compliance: No active grid emergency declarations. Earlier May 2026 Level 3 alert on data center load volatility remains in effect as monitoring guideline; no additional Level 3 or higher alerts current as of July 27. Standard reliability guidelines in effect across all regions.
  • Regulatory and Market Rule Updates: No major FERC orders or market rule changes effective this week. 2026 summer reliability assessment and resource adequacy filings completed by all ISOs; compliance tracking ongoing.

HOW INTELLASTAR ENERGY ANALYST CAN HELP

Summer peaks have passed, but capacity compliance and demand-side positioning remain critical through Labor Day.

PJM — ELEVATED

5CP allocation compliance requires constant capacity position monitoring through Q3 settlement.

Intellastar Energy Analyst tracks your real-time capacity margin against PJM 5CP tags and alerts you to shortfalls before settlement. Optimize demand response contribution to meet obligations cost-effectively and avoid penalties.

See how 5CP tracking works →

ERCOT — ELEVATED

4CP obligations remain active through September; ORDC price sensitivity persists during peak hours.

Intellastar Energy Analyst monitors ERCOT ORDC adders and load forecasts hour-by-hour, helping your DR program dispatch at maximum value. Automate bidding strategy to capture economics while meeting 4CP compliance requirements.

Review your 4CP position →

NYISO — WATCH

ICAP obligations and CBEP participation opportunities continue through end of summer.

Intellastar Energy Analyst provides ICAP tag forecasting and CBEP program participation analysis. Align your demand-side portfolio to maximize ICAP and emergency participation revenue while managing peak-period compliance efficiently.

Talk to an analyst →


Intellastar — energy intelligence for demand-side organizations
Schedule a conversation